My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/22/2006 12:55 9094767114 SHIRLEY ENVIRONMENTL PAGE 03/04 <br />UST SYSTEAA RETROFIT OR REPAIR <br />(Submit minimum of 2 sets of plans & applications as originals will be retained by EHD) <br />t. Site map enclosed YES[] NO <br />2. Manufacturer's spec sheets attached for all equipment to be installed YES ] ] NO <br />3. Description of work to be completed (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br />4. Description of equipment to be used (Attach drawings/blueprints as necessary). <br />5. All equipment is State certified or approved. YES "Ci [ ] <br />6. De amination Procedures: <br />a. l/thll piping be decontaminated prior to removal? YES[] NO ( J <br />b. Identify contractor performing decontamination: <br />Phnner 1 <br />N� <br />city <br />C, Describe method to be used for decontamination. <br />d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br />e. Rinsate Hauler and permitted Treatment, Storage & Disposal Facility: <br />Hauler Name PhOne(Hauler <br />Address City ,zip <br />Permitted Disposal Site <br />Describe the method that will be utilized to purge and/or inert the piping: <br />Piping Hauler <br />Name PhoneO_ <br />Address cty — zip <br />Hauler Registration # (if hauled as hazardous) <br />Piping Disposal Site'. <br />EPA <br />to a <br />Phone (�), <br />I _ _ Zlp <br />8. \is the sampling firm an independent third party from the contractor? YES[ ] NO [ ] <br />10. <br />in detail, how the soil and/or water sample(s) beneath the piping or dispenser will be, obtained: <br />of excavated soil (Contaminated Soil Hazardous Waste Hauler): <br />Hauler Registration # Phone �) <br />city _ zip <br />b) If soil is not to be hauled, describe what will be done with it: <br />
The URL can be used to link to this page
Your browser does not support the video tag.