Laserfiche WebLink
- - 4i �_W Page_of— <br /> SWRCB,January 2002 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: <br /> ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) — <br /> Test0EqmenUsed: ion: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> -- <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />