Laserfiche WebLink
Scott Covey <br /> Covey Engineering Inc <br /> 985 Kendall Drive, Suite A-151 <br /> San Bernandio, CA 92407 <br /> Re: YRC Inc SR0061778 <br /> 1535 East Pescadero Ave, Tracy, CA 95376 <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to install a pull annular sensor on the gear oil by removing the stuck <br /> push annular sensor by breaking concrete and removing the riser on the gear oil tank on the <br /> underground storage tank(UST)system at the above noted address. In addition, technicians <br /> will verify the placement position for: annular sensors on tanks T-3,T-4, T-5, and T-6 and liquid <br /> detection sensor for diesel sump L-2. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the'San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Thuy Tran at(209)468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. <br /> b. Corrosion protection: Verify corrosion protection for annular riser prior to backfilling. <br /> c. Secondary containment testing on gear oil tank, its piping and other affected piping. <br /> Please be aware that the facility cannot operate the gear oil tank prior to the EHD <br /> inspection and approval. <br /> 4. Since concrete will be broken near the gear oil tank and its piping, a secondary <br /> containment test must be performed on both the gear oil tank, its piping and any other <br /> pipings in the vicinity once concrete is poured in accordance with the manufacturer's <br /> guidelines. <br /> NO arinsau <br /> z ssa <br /> BE 100 ,L aJKSn <br /> 9S :ET TT/ZO aNIJ, 'SS <br /> OI NOLLHNISSaa <br /> ssaucavans/aMsd <br /> Z11£9T9116 SSHUaOV NOI,LKNI1S2Q <br /> 9116£ 'ON SO2 <br /> )IO NOISSINSMVUM <br /> xxxxxxxxxxxxxxxxxxxxx <br /> xxx ,INOdau XS xva xxx <br /> xxxxxxxxxxxxxxxxxxxxx <br /> Tooln OHS 02S EE11Eb. 0z Xva LS:ET IHd TTOZ/TT/ZO <br />