My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:08:46 PM
Creation date
11/8/2018 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2011
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2010 - 2011 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2011
QuestysRecordDate
12/7/2016 6:42:09 PM
QuestysRecordID
3273248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar 14 11 07: 41a Elite TV Contactors 1209461 -342 <br /> IV Air <br /> W 77d <br /> UST SYSTEM RETRORT OR REPAI k <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by D) <br /> 11. Site map enclosed? YES(] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all ri; 'iufacb01W.train sates for <br /> each person installing or testing any componentthat is repaired or replaced. nsure a Copyealth <br /> and Safety Plan" is available on the jobsite as required by Title B. "t <br /> 3- Detailed description of work to be completed. List components to be repaired ir replaced and attach a diagram <br /> drawn to scale showing location of repairs and/or replacements. If repairing a omponent, describe how this will <br /> be done. (If adding piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the LIST <br /> Installation <br /> in tion Application pages 4-8 as necessary for a timely plan review): <br /> xj 0-nd <br /> a.t lw(0-7. Qn Ind ! "id <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showh .1 third-party approval): <br /> 79`1390 VU <br /> V fil 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.