My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:08:46 PM
Creation date
11/8/2018 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2011
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2010 - 2011 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2011
QuestysRecordDate
12/7/2016 6:42:09 PM
QuestysRecordID
3273248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Site Address: 1535 E PESCADERO AVE Date of Testing/Service: 03/24/2011 <br /> F. In-Tank Gauging / SIR Equipment <br /> ❑ Check this box if tank gauging is used only for inventory control. <br /> ® Check this box if no tank gauging or SIR equipment is installed. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No• Was accuracy of system product level readings tested? <br /> ❑Yes ❑No• Was accuracy of system water level readings tested? <br /> Yes ❑No• Were all probes reinstalled properly? <br /> ❑Yes 1 0 N Were all items on the equipment manufacturers'maintenance checklist completed? <br /> •In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : Fx� Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑Yes ❑No ❑N/A (Check all that apply)Simulated leak rate: ❑ 3 g.p.h❑0.1 g.p.h ❑0.2 g.p.h <br /> Yes ❑No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑No• Was the testing apparatus properly calibrated? <br /> Yes 0 N• ❑WA For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ONO* ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ON,• ❑WA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ONO' ❑WA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes —]No-• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.