Laserfiche WebLink
.,10, <br />SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />Thu form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: YRC 813 Date of Testing: 2/6/2017 <br />Facility Address: 1535 E PESCADERO AVE, TRACY, CA 95304 <br />Facility Contact: CHRIS ROY Phone: 209-993-7946 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (ifpresent during testing): victoria 7a 'I- <br />y <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY INC. `- " - <br />Technician Conducting Test: Steve W illems <br />Credentialsl: W CSLB Contractor Pr ICC Service Tech. r SWRCB Tank Tester r Other (SpeciifENVIRONMENTAL HEALTH <br />License Number(s):A hr= <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used By: rv_1 Hydrostatic r Vacuum r Other <br />Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, ere.) <br />Spill Box # Tank Soap Tank <br />OTHER - Fill I - Direct - <br />Grade level <br />Spill Box # Tank waste oil <br />neartack WASTE OIL -Fill <br />I - Direct - Grade level <br />Spill Box # Tank anti freeze <br />ANTIFREEZE - Fill 1 - <br />Direct - Grade level <br />Spill Box # Tank gear oil <br />GEAR OIL - Fill 1 - Direct - <br />Grade level <br />Bucket Installation Type: <br />• Direct Bury <br />A Contained in Sump <br />6 Direct Bury <br />R' Contained in Sump <br />G Direct Bury <br />r Contained in Sump <br />G Direct Bury <br />(" Contained in Sump <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />22.25 <br />20.75 <br />18.50 <br />21.50 <br />Wait time between applying <br />vacuum/water and start of test <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time (T,): <br />10:27:00 <br />12:03:00 <br />11:31:00 <br />11:31:00 <br />Initial Reading (Rl): <br />21.75 in. H2O <br />20.00 in. H2O <br />17.50 in. H2O <br />20.00 in. 1420 <br />Test End Time(TF): <br />11:27:00 <br />13:03:00 <br />12:31:00 <br />12:31:00 <br />Final Reading (RF): <br />21.75 in. H2O <br />20.00 in. 1420 <br />17.50 in. H2O <br />20.00 in. H2O <br />Test Duration(TF—Tl): <br />I hr <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF—RI) : <br />0.00 in. H2O <br />0.00 in. H2O <br />0.00 in. H2O <br />0.00 in. 1420 <br />Pass/Fail Threshold or Criteria: <br />+/-0.00 <br />+/-0.00 <br />+/-0.00 <br />+/-0.00 <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHMCGIN RESPONSBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: 0 JQ t -- <br />Date: 2/6/2017 <br />'State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. <br />WO 2329893 <br />