My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:16 AM
Creation date
11/8/2018 9:53:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PINE\1126\PR0231364\COMPLIANCE INFO 1986-1997.PDF
QuestysFileName
COMPLIANCE INFO 1986-1997
QuestysRecordDate
9/7/2017 7:10:04 PM
QuestysRecordID
3628042
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.F. KLUD-P& SONS, INC. <br /> MOBIL & t;XXON PRODUCTS JOBBER <br /> 1126 E. PINE ST.-PO BOX 166 LODI, CA 95241 <br /> May 29, 1997 <br /> Mr. Eric Trevena <br /> SJCEHD <br /> 304 E. Weber Ave, Third Floor <br /> Stockton, CA 95202 <br /> Dear Eric; <br /> Listed below are the items that have been or will be completed in regards to your <br /> underground tank program official inspection report dated 4/4/97: <br /> 1. Copy of Veeter-Root monitoring systems inspection report dated 5/$/97. <br /> 2. Line test results on tanks 6 & 7 completed by Afforda Test you should recieve next <br /> week. Tank 8's line needs an isolation valve installed after the 3hp turbine in order <br /> to perform a line test. I plan to install this valve and perform line test this fall when <br /> the tank upgrades are done on the rest of tanks and linFs. <br /> 3. Leak detector results on tank 6 & 7 will be sent by Afforda Test also. Again leak <br /> detector test could not be done on tank 8 because it needs an isolation valve installed. <br /> 4. Corrosion protection system could not be perfomed on tanks 4 & 5 because no test <br /> port was orginally installed. I plan to install new sacificial anodes with test ports whgn <br /> tank upgrades are performed this fall. <br /> 5. Annular space monitors will be installed in tanks 4 &5 with tank upgrade this fill. <br /> 6. Enclosed is the revised annular inventory reconciliation report for 1994. <br /> 7. Leak detector test can not be performed on tanks 1,2 &3 due the fact that the 5hp <br /> turbines do not have an isolation valve after the turbine. These single wall lines will be <br /> removed and upgraded to double wall lines this fall with the rest of the tank upgrade. <br /> 8. Line test can not be performed on tanks 1,2 & 3 due to no isolation being installed after <br /> the 5hp turbine. Again, as noted in item 7 these lines will be removed and upgraded. <br /> Eric if you have any questions in regards to the above items, please call me. <br /> Regard <br /> Stephen Kludt <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.