Laserfiche WebLink
0 0 <br /> Aris Veloso [EH] <br /> From: Aris Veloso [EH] <br /> Sent: Tuesday, February 10, 2015 4:22 PM <br /> To: 'steve@kludtoil.com' <br /> Subject: CERS corrections needed for 1126 E Pine St Lodi CA <br /> Hi Steve, <br /> I just finished reviewing your 1/6/2015 10:33AM CERS submittal and made of list of corrections needed. <br /> UST rejected via CERS <br /> This UST submittal was rejected by Aris Veloso, REHS, ICC Certified UST Inspector, on 2-10-15. The <br /> following items need to be addressed/corrected: <br /> Racing Fuel Tank Monitoring is Performed Using the Following Method(s) <br /> Monitor Panel Model should be x76s. <br /> Leak Sensor Model # should be LS-3. <br /> Racing Fuel Pipe Monitoring is Performed Using the Following Method(s) <br /> Panel & Leak Sensor Manufacturer should be Veeder Root. <br /> Panel Mode] # should be TLS-350. <br /> MLLD Manufacturer should be Red Jacket. <br /> MLLD Model should be XLP. <br /> Racing Fuel Under Dispenser Containment (UDC) Monitoring <br /> UDC Panel Manufacturer should be Veeder Root. <br /> UDC Panel Model # should be TLS-350. <br /> UDC Leak Sensor Manufacturer should be Veeder Root. <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown should be yes. <br /> Failure/Disconnection of UDC Monitoring System 'Triggers Automatic Pump Shutdown should be yes. <br /> Kerosene UST Tank Information/Monitoring Plan: <br /> Vent, Vapor Recovery (VR) and Riser/Fill Pipe Piping Construction information should be entered. <br /> Kerosene Tank Monitoring is Performed Using the Following Method(s) <br /> Monitor Panel Model should be x76s. <br /> Leak Sensor Model # should be LS-3. <br /> Kerosene Pipe Monitoring is Performed Using the Following Method(s) <br /> Panel & Leak Sensor Manufacturer should be Veeder Root. <br /> Panel Model # should be TLS-350. <br /> MLLD Manufacturer should be VMI. <br /> MLLD Model should be LD2000. <br /> Kerosene Under Dispenser Containment(UDC) Monitoring : <br /> UDC Panel Manufacturer should be Veeder Root. <br /> UDC Panel Model # should be TLS-350. <br /> UDC Leak Sensor Manufacturer should be Veeder Root. <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown should be yes. <br /> Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown should be yes. <br /> Clear Diesel UST Tank Information/Monitoring Plan: <br /> Corrosion Protection <br /> t <br />