Laserfiche WebLink
D. Results of Testing/Servicing 0RECEIVED <br /> Software Version Installed: 125.02 JUN 2 7 2014 <br /> Com late the followin checklist: <br /> Yes ❑ No' Is the audible alarm operational? <br /> EWIR6PAIETH <br /> [Ele ❑ No• Is the visual alarm operagonal7❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ No• Were ell sensors instelletl at lowest point of secontlary containment and positioned so that other equipment will not interfere with their prepayoperation? <br /> ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ❑ Nc' For pressurized piping systems,does the turbine automatically shut down rf the piping secondary containment moniI nag system detects a leak,N/A fails to operate, or is electnwlly disconnected? If yes: which sensors inhiata positive shut-down? (Check all that apply) ® SumprrmnchSanson;; ®Dispenser Containment Sensors. <br /> Ditl you confirm positive shutdown due to leaks and sensor failure/tlisconnection7 ®Vas; ❑No. <br /> ❑ No• For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overall prevention valve is® N/A installed),is the overfill warning alar visible antl audible at me tank fill point(s)and operat ng properly? If so,at what percent of tank rapacitydoes the alarm trigger? %o Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced antl list the manufacturer nameend model for all replacement parts in Section E,below. <br /> ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ <br /> Yes Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No• Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes I ❑ No- I Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 2/21/07 <br />