Laserfiche WebLink
r <br /> REWED <br /> SWRCB,January 2006 <br /> Spill Bucket Testing Report FARIIZ 7.2014 <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed farm and <br /> printouts from tests(if applicable), should be provided to the facility ownerlaoarg"MttM ;Rulatory agency. <br /> 1.FACILITY INFORMATION pEpARTMENT <br /> Facility Name: E.F.KLUDT&SONS I Date of Testing: 4/1/2014 <br /> Facility Address: 1126 E.PINE ST. LODI,CA 95240 <br /> Facility Contact: STEVE Phone: 209-368-0634 <br /> Date Local Agency Was Notified of Testing:3/5/2014 <br /> Name of Local Agency Inspector(if present during testing): JEFF WONG <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2nd Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo N Zane A.Nimmo ❑ David A.Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials: N ICC Service Tech. N SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: N Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE,H2O I Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank 1 20K DIESEL 2 2 RED DYED DIE 3 RED DIESEL 4 <br /> Number, Stored Product, etc) MAIN SYPHON <br /> N Direct Bury ❑Direct Bury N Direct Bury ❑Direct Bury <br /> Bucket Installation Type: ❑Contained in ❑Contained in <br /> ❑Contained in Sump ❑Contained in Sump SumpSum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 11 14 11 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(T,): 1325 1325 <br /> Initial Reading(R,): 10 10 <br /> Test End Time(TF): 1425 1425 <br /> Final Reading(Rr): 10 10 <br /> Test Duration(TF—T,): HR HR <br /> Change in Reading(RF-Rj): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: N Pass ❑Fail ❑ Pass ❑ Fail N Pass ❑Fail I ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> RED DIESEL MAIN SPILL NOT USED CLOSED BY OWNERS. <br /> RED DIESEL FILLED BY USE OF SYPHON TANK. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature:_e4 " "—�Z Date: 4-1-14 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />