Laserfiche WebLink
• <br /> UST SYSTEM RETROFIT OR REPAIR AUG 2 4 2018 <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> "��allhl= <br /> 1. Site map enclosed? YES[] NO(] -- <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Fill drain on kerosene bucket not assin lake test. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> (1) EBW 705-332-18 Replacement kit pull to push drain <br /> EH230038(revised 12-11-15) 3 <br />