Laserfiche WebLink
San Joaquin County <br /> Department Environmental Health DIRECTOR <br /> Linda Turkatte,REHS <br /> r.` 1868 East Hazelton Avenue <br /> PROGRAM COORDINATORS <br /> �: flmure ' Stockton, California 95205-6232 Robert McClellon,REHS <br /> Jeff Carruesco,RENS,RDI <br /> Kasey Foley,REHS <br /> Website: www.sjgov.org/ehd Adrienne Ellsaesser,REHS <br /> <<F OR Phone: (209)468-3420 Rodney Estrada,REHS <br /> Fax: (209) 464-0138 Willy Ng,REHS <br /> 12-11-15 <br /> Carrie Miller <br /> Elite IV Contractors <br /> 2535 Wigwam Dr. <br /> Stockton, CA 95205 <br /> Re: E. F. Kludt& Sons Inc. 1126 E. Pine St Lodi, CA 95240 SR0073835 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to install an OPW 1 C-2100C-DEVR 5-gallon fill bucket, OPW 1 C- <br /> 2100C-PEVR 5-gallon vapor bucket, OPW 71 SO-4106-EVR Overfill Drop-Tube, OPW FSA-400- <br /> S face seal adapters, OPW61 SALP-1020 EVR fill adaptor, OPW 61 VSA-1020 EVR vapor <br /> adapter, and OPW 61SK-44CB on the underground storage tank (UST) system at the above <br /> noted address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aris Veloso at (209) 468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Overfill prevention verification: Measurement of drop tubes to verify 95% tank volume <br /> shut off. <br /> b. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling. <br /> c. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> Please be aware that the facility cannot receive fuel in the 100 octane tank prior to <br /> the EHD inspection and approval. <br /> 4. Since concrete will be broken near the 100 octane UST and piping, a secondary <br /> containment test must be performed on the 100 octane UST and piping once concrete is <br /> poured in accordance with the manufacturer's guidelines. <br />