My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 1:27:20 PM
Creation date
11/8/2018 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PINE\1126\PR0231364\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
9/7/2017 11:31:40 PM
QuestysRecordID
3629872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGEI V EL <br /> UST SYSTEM RETROFIT OR REPAIR DEC 0 9 2015 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) �ypp�� <br /> 1. Site map enclosed? YES[] NO EWFI NVIR�tVMEN .L <br /> IR f1CDP DTgq T <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the'Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Installation of EVR equipment on 100 octane( Rancing Fuel) under ground storage tank <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 1. OPW 1C.2100C-DEVR 5-Gallon Fill Bucket 1.OPW 61SALP-1020 EVR Fill Adapter <br /> 1.OPW 1 C-2100C-PEVR 5-Gallon Vapor Bucket 1.OPW 61 VSA-1020 EVR Vapor Adapter <br /> 1.OPW 71 S0-4106-EVR Overfill Drop-Tube 1.OPW 61JSK-44CB <br /> 2.OPW FSA-400-S Face Seal Adapters <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.