My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 1:27:20 PM
Creation date
11/8/2018 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PINE\1126\PR0231364\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
9/7/2017 11:31:40 PM
QuestysRecordID
3629872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO Overfill PreventioValve <br /> Page 3 of 8 <br /> * OPW Test Lab results <br /> No Epoxy Sealants Required! <br /> Raising the Standard in Overfill Prevention <br /> From the company that brought you the industry standard OPW 6150, OPW raises the standard <br /> with the introduction of the New 7150 Overfill Prevention Valve - breakthrough innovation that <br /> takes overfill prevention to a whole new level of overfill perfection. <br /> The new 71 SO is a two-stage, positive shut-off valve, providing completely automatic operation <br /> with no pre-checks to perform, no resets, and no overrides to be broken or abused. The valve <br /> closes when the tank level rises to 95%capacity and provides a special bypass valve so the tank <br /> can be filled to a maximum capacity of 98%. The 71 SO is available for direct-bury and remote <br /> applications. <br /> • Eliminates curing issues due to hot or cold temperatures <br /> • Easier, quicker, installation <br /> • Higher quality, more reliable installation <br /> • Lower costs <br /> • Greater protection against fugitive emissions and pressure decay 41 <br /> • Fastest flow rate in the industry <br /> IVED <br /> DEC 10 2015 <br /> ENVIRONMENTAL <br /> WF:AITH nFDADFrAA':hlT <br /> http://www.opwglobal.com/products/us/retail-fueling-products/bolow-grou... 12/10/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.