Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version installed: 126.02 <br /> Com fete the foilowin checklist: <br /> ® Yes ❑ No' Is the audible alarm operational? <br /> ® Yes ❑ No' Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positionQt",hat other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipme .,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the pipcondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes:which sensors initiate pshut-down? (Check all that apply) ® Sump/1'rench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ; ❑No.Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill wdevice(i.e., no mechanical overfill prevention valve is® N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)anating properly? If so,at what percent of tank capacitydoes the alar trigger? %❑ Yes ® No Was any monitoring equipment replaced? If yes,identity specific sensors,probes, er equipment replaced and list the manufacturer nameand model far all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systeheck all that apply)❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reapplicable <br /> ® Yes ❑ No' I Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br /> MAY 0 2 2016 <br /> q� . --11 <br />