Laserfiche WebLink
3A.Put half of t*floats into fluid soak and half into a vnrer soak in the Costco additive. <br /> Confidcnli;d <br /> Notice:This document coulains <br /> 1prictary and.1radc secrets <br /> omtalion of OPw. <br /> Copy or other dissimulation is <br /> strictly forbidden. -- <br /> i <br /> i, <br /> Figure 2 -Parts in Soak <br /> 4A.Measure all parts as done in step 2A after 1 week in soak. Measure parts again after <br /> drying for 24 hours. <br /> SA.Repeat step 4A after 4 week soak. <br /> 61fSTOP and Spill Container Soak Test <br /> 1B.Gather one of each of the the following OPW products: 61fSTOP-2000 overfill <br /> prevention valve,P761C-EVRDV spill container with drain valve, 634B-0160 cap, <br /> 1612AN-0200 adaptor, and 61FT-0206 drop tube. On the 61fSTOP the standard <br /> production test at high and low flow was conducted when assembled. <br /> 213.Construct the test fixture shown in Figure 3. To build this test fixture a 4"NPT black <br /> iron cap,4"NPT x 5" length steel nipple,4"NPT x 6"length steel nipple,4"NPT x <br /> 12"length steel nipple, and a 4"NPT black iron coupling were used. On the nipple <br /> in the spill container tap a %4"NPT thread into the side. Loctite 567 thread sealant <br /> was used on all NPT joints. <br />