My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3A.Put half of t*floats into fluid soak and half into a vnrer soak in the Costco additive. <br /> Confidcnli;d <br /> Notice:This document coulains <br /> 1prictary and.1radc secrets <br /> omtalion of OPw. <br /> Copy or other dissimulation is <br /> strictly forbidden. -- <br /> i <br /> i, <br /> Figure 2 -Parts in Soak <br /> 4A.Measure all parts as done in step 2A after 1 week in soak. Measure parts again after <br /> drying for 24 hours. <br /> SA.Repeat step 4A after 4 week soak. <br /> 61fSTOP and Spill Container Soak Test <br /> 1B.Gather one of each of the the following OPW products: 61fSTOP-2000 overfill <br /> prevention valve,P761C-EVRDV spill container with drain valve, 634B-0160 cap, <br /> 1612AN-0200 adaptor, and 61FT-0206 drop tube. On the 61fSTOP the standard <br /> production test at high and low flow was conducted when assembled. <br /> 213.Construct the test fixture shown in Figure 3. To build this test fixture a 4"NPT black <br /> iron cap,4"NPT x 5" length steel nipple,4"NPT x 6"length steel nipple,4"NPT x <br /> 12"length steel nipple, and a 4"NPT black iron coupling were used. On the nipple <br /> in the spill container tap a %4"NPT thread into the side. Loctite 567 thread sealant <br /> was used on all NPT joints. <br />
The URL can be used to link to this page
Your browser does not support the video tag.