Laserfiche WebLink
61 fSTOP and Spill'ontainer Soak Test <br /> No leaks seen at drain valve up to 15 psi before soak testing. Soak test started on 9-21-11. <br /> Removed from soak on 10-20-11. No leaks seen at drain valve up to 20 psi after 4 week soak. <br /> Hydrostatic test on spill container started at 6 PM on 10-20-11. Filled spill container to top of <br /> 1612AN adaptor(no cap on adaptor). <br /> Time Water Level Confdemial <br /> Notim,nds document contains <br /> Start At top of 1612AN adaptor propriclary,and[mile secrets <br /> 22 hrs At to of 1612AN adaptor Copy union nrorw. <br /> Copy or other diasimulalion is <br /> 7 days Water level %2"below top of adaptor slriclly forbidden. <br /> 8 days Water level Y2"below top of adaptor <br /> 61fSTOP-2000 was removed from the test fixture and evaluated. No visual issues with valve. <br /> Passed high and low flow test on production line after 4 week soak test. <br /> PIP"M <br /> Figure 8-61fSTOP-2000 After 4 week Soak <br /> 6lfSTOP Operation with Costco Additive <br /> 61 fSTOP-2000 reset properly when simulated overfill was conducted with Costco additive at <br /> room temperature. <br /> Per the specification sheet the Costco additive has a viscosity of 7 CST at 40° C, 10 CST at 25° <br /> C,and 23 CST at 0°C. The 61fSTOP valve has been recommended and tested with oils such as <br /> I OW-50 which have viscosity values over 100 CST. <br /> Prepared by: Kris Kane <br />