My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOUDATED FORM BCE #14573 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page I of 2 <br /> TYPE OF ACTION ❑ L NEW PLAN N 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL UST%AT THIS FACILITY. <br /> (Check one item only) N2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Tank#4-LUBRIZOL <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) t. <br /> BUSINESS NAME(Some as Facility Name orDBA) 3. <br /> Costco GasoPlne(Loc.No.1091) <br /> BUSINESS SITE ADDRESS 103. CITY IN. <br /> 2660 REYNOLDS RANCH PARKWAY I LODI <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detector;etc.)must be perfumed at the frequency specified <br /> by the equipment numufact3nms'instructions,cr annually,whichever is more frequent.Such work must be performed by qualified personnel.123 CCR 12632,n34,M 264n <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 0.%-U.4%3b. <br /> III. MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 ccs§2632,2634) 490-4, <br /> IV. TANK MONITORING'IS PERFORMED USING THE FOLLOWING METHOD(S) that apply); <br /> [10 1.CONTINUOUS ELECTRONIC ONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4%,5. <br /> WITH AUDIBLE AND VISUAL ALARMS 123 cert§7632,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY R b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49"- <br /> PANEL MANUFACTURER- Veeder-Root 490'9• MODE1.#: TLS-35OR d90-11. <br /> LEAK SENSOR MANUFACTURER: Veeder•ROot 494-9. MODEL#(S: 794380-303 49Mt0. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(SI.In MR12m31 49 111. <br /> PANEL MANUFACTURER 4MI2. MODEL 0: 49613. <br /> --. <br /> -..--INTANK PROSEMANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a_CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49616. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49x0' <br /> PROGRAMMED TESTS: ❑ a.0.1 SPA ❑ It.0.2 li.pli. ❑ c.OTHER S cei : 4qo t�9.ts. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23ccR§26r6.n +gam. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MIG)[23 ecu§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490'21. <br /> u. <br /> ❑ 5.TANK INTEGRITY TESTING PER[D ort§m3.11 490-23. <br /> TEST FREQUENCY-. _ ❑ a-ANNUALLY ❑ b.BIENNiALLY ❑ c.OTHER(Specify): 4W24. <br /> ❑ 99.OTHER(Specify): X4.2 6" <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS) u�arek lB <br /> ❑� I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. +saes. <br /> 4y6SECONDARY CONTAINMENT IS: (pa.DRY [M b.LIQUID FILLED ❑ c.PRESSURIZED 9 d.UNDER VACUUM 490.29. <br /> PANEL MANUFACTURER Veeder-Root 490-30• MODEL#: TLS-350R 49o-31. <br /> LEAK SENSORMANUFACI'URER: Veeder-Root 49432. MODEL#(S): 794390333,769380-3Na,9572aa100 490'33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑9 a.YES ❑ b.NO 49x34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9 &YES ❑ b.NO 490.35. <br /> NJ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h-LEAK TESTS AND RESTRICTS OR SHUTS OFF 40036. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 ocR126361 <br /> MLLD MANUFACTU s): PE Petro 49"7. MODEL#(S): MLD-D 49&38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0&p.h.LEAK TESTS.[23 c §2636] 490"3% <br /> ELLD MANUFACTURER(S): 49 . MODEL#(S): 49 [- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 02 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49a4z <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 49oa3. <br /> ELLD FAILURE/DISOONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. _ ❑ a YES ❑ b.NO 490'44. <br /> ❑ 4.PB'E INTEGRITY TESTING. etiais' <br /> TEST FRE UENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ o.OTHER(Specify) 4". <br /> 96+7. <br /> ❑ 5.VISUAL PIPE MONITORING. 49o-16. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49a49- <br /> •n9ew.dr mo�ud u4va14aied s�6b oft 38c ss261 __ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[231 12636(�H3)1 49asa <br /> ❑ 7.NOREGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM. 49o-st. <br /> © <br /> 99.OTHER(Specify) 4W52. <br /> ) 49453. <br /> UPCF UST-D(12/2007)-I/4 www.anidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.