My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BCE #14573 <br /> ° , N San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Donna ORHeran,REHS <br /> j 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Canuesoo,REHS,RDI <br /> Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209) 468-3420 <br /> Fax: (209)464-0138 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> INSTALLATION PERMIT <br /> San Joaquin County Environmental Health Department (EHD) has established the following guidelines to <br /> assist you in the completion of your construction project. The guidelines specify the construction and <br /> monitoring criteria necessary to complete our review of your proposed underground storage tank (UST) <br /> system. <br /> A. PLAN REVIEW GUIDELINES FOR NEW INSTALLATION OF UST's <br /> 1. An installation permit and payment of appropriate fees shall be required for the installation or <br /> modification of any underground storage tank system, which will be used for hazardous <br /> substances. <br /> 2. Contractors shall submit, or have on file with the local agency, information verifying that they <br /> possess a current State Contractor's License (A, B, C-36, or C-610-40), hazardous <br /> substance removal certification, and Workmen's Compensation Insurance. <br /> 3. The contractor shall be responsible for ensuring that conditions at the site provide for <br /> workplace safety, protection of the environment, and maintenance and integrity of nearby <br /> structures. <br /> 4. Under no circumstances shall any regulated material be placed into any underground tank <br /> system without approval of the EHD. <br /> 5. All tanks, piping, and equipment shall be installed and tested in accordance with the <br /> manufacturer's recommendations/guidelines. <br /> 6. All interstitial monitors must perform according to manufacturer's standards, and must be <br /> tested annually in accordance with section 2630 (d), California Code of Regulations (CCR), <br /> Title 23 Waters, Division 3, Chapter 16. <br /> 7. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified <br /> Air Pollution Control District, the County/City Building Department and the appropriate Fire <br /> District. <br /> 8. Applicant/contractor shall adhere to the approval plan and any change or deviation shall be <br /> reported to and approved by EHD prior to installation. <br /> 9. The application for installation of underground tanks is only valid for the calendar year in <br /> which it has been issued. A permit may be extended into the next calendar year if a letter is <br /> sent to EHD requesting this extension thirty days prior to the end of the calendar year. A one <br /> time, one year extension may be granted by EHD upon receipt of this letter. <br /> Revised 8/1/11 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.