LODI , CA ADDITIVE TANK ADDITION
<br /> UNDERGROUND TANK INSTALLATION DETAILS w
<br /> Q
<br /> Z
<br /> 0
<br /> E a-
<br /> V) Pt
<br /> z
<br /> LJ
<br /> M
<br /> Z < z
<br /> < LL
<br /> < w
<br /> (j V) -Ne
<br /> ui �
<br /> 1� Z
<br /> cr 1cc Z
<br /> u-i
<br /> C 7
<br /> �L J
<br /> uj
<br /> 0 0
<br /> aw _j
<br /> 7" CONCRETE TANK SLAB z 0
<br /> MATCH EX, CROWN I *1 44 @ 18" O"C. BOTI-I WAYS EXISTING CONCRETE PAVEMENT 10 REMAIN
<br /> 0 Z
<br /> -rYP, ALL)
<br /> _(_T�P_l
<br /> TYP,) 7 PLASTIC CAP
<br /> W
<br /> 0
<br /> ------------
<br /> Zz ac
<br /> L
<br /> s,
<br /> cr—
<br /> w
<br /> -------------
<br /> co
<br /> GUARD POST. 6"o STD, PIPE-,
<br /> T
<br /> bi
<br /> �3" VIN� (jiri
<br /> CONCRETE FILLED & NN Z cq
<br /> ly
<br /> COVERED WIS
<br /> TH RED
<br /> Lo
<br /> PLASTIC SLEEVE
<br /> \--SAVv'C(.TT AND MATCH WITH 4'---0 C14 C) 0
<br /> #3 TOP & BOTTOM 0' co
<br /> AROUND ALL. PENETRATIONS (T'YP,) EXISTING, PER ,JOINT A] TANK
<br /> SLAB DETAIL BELOV/, LOCATION NOTE: EX. GUARD POSTS ONSITE c,4 6
<br /> PER PLAN SHEET C`1_3 HAVE YELLOW PLASTIC SLEEVES z
<br /> PEA GRAVEL GRADE
<br /> NOTE:
<br /> ,JILL ',V/ JOINT SEALER
<br /> ALL MANHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A CROWN OF
<br /> CONCRETE THAT MATCHES EXISTING TO PREVENT WATER INTRUSION INTO THE NEW CONCRETE
<br /> PAVEMENT
<br /> MANHOL.E. THE OWNER'S ENGINEER WILL BE REQUIRED TO SIGN OFF ON THIS ITEM EXISFING CONCRE
<br /> TE PAVEIJENT qwP
<br /> ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PAID,
<br /> ............. EMBED 4'-0"
<br /> CONTRACTOR WILL BE REQUIRED TO REINSTALL ENTIRE DRIVE SLAB AT OWN
<br /> EXPENSE IF THIS DESIGN REQUIREMENT IS NOT MET, w
<br /> 1�> 15"o
<br /> ----------
<br /> PNI
<br /> CONCRETE SLAB SPECIFICATIONS Lu o
<br /> do
<br /> 1 UNLESS OTHERWISE NOTED ON THESE DRAWINGS: 3/4"Ox15" SI,100TH D&�ELS CONCRETE FOOTING—"".�7 W
<br /> @ 15" O.C. CENTERED
<br /> <
<br /> ca CONCRETE - REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT) IN JOINT (OILED) o
<br /> b, CEMENT - TYPE 11, SULFATE RESISTANT
<br /> c. AGGREGATES - ASTM C33, (MAXIMUM SIZE 3/4 INCHES) T w
<br /> d, 28 DAY CONCRETE STRENGTH (Cc):
<br /> 3000 PSI SLAB (DESIGN BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED) JOINT AT TANK SLAB
<br /> e. SLUMP 3"+ 1" - 4" MAXIMUM AT POINT OF PLACEMENT
<br /> I. SHRINKAGE 0,05% MAXIMUM NOT TO SCALE TYPICAL GUARD POST 0 _j :3
<br /> q. ENTRAINED AIR RANGE - 4% TO 7%
<br /> 011 T TO— S._CA_lE--—-
<br /> 2, CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF I : 2 1/2 : 3 112, WITH A MAXIMUM <
<br /> 7 1/2 GALLONS OF WATER PER SACK, Cy)
<br /> 0 CD
<br /> I REINFORCING STEEL FOR TANK SLABS SFi[ALL BE #4 REBAR 0 18- O,C, BOTH WAYS
<br /> SUMP CAGES SHALL BE #4 REBAR TOP AND BOTTOM (4 BARS),
<br /> 4. MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST 7 DAYS AFTER PLACEMENT,
<br /> 5. PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS, DO NOT PUMP CONCRETE UNLESS
<br /> SPECIAL INSPECTION, IN ACCORDANCE WITH CHAPTER 3 OF THE UBC, IS PROVIDED,
<br /> B. CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR., L
<br /> 0
<br /> 7. BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, ANDljL
<br /> OTHER INSERTS IN POSITION TO PREVENT MOVEMENT,
<br /> I- S 0
<br /> 8, MATERIALS AND WORKMANSHIP SHALL CONFORM TO A.C.I. 318 (SPECIFICATIONS OF THE - ------
<br /> DESIGN AND PLACEMENT OF CONCRETE).
<br /> HAL P. U
<br /> BB
<br /> ASPHALT PAVEMENT PATCH, MATCH EXISTING 6/30/1�
<br /> MATERIALS AND THICKNESS WHICHEVER IS GREATER,
<br /> c v
<br /> ----LANDSCAPE AREA MULCH
<br /> AND TOPSOILS AS PER Ll;
<br /> MIN, 3" MULCH OVER 4"
<br /> EXISTING CONCRETE TANK SLAB REPAIR/REPLACEMENT SECTION NEAT LINE SAWCUT PRIOR,.--- 4; c < ra
<br /> u <
<br /> TOPSOIL -6 0 -,, lz '_1
<br /> TO PAVEMENT PATCH WITH z I- ___j
<br /> NOT TO SCALEHOT TAR SEAL 0 > En
<br /> LANDSCAPE AREA
<br /> /111__-__BAC_KF I L FWTC_WPE.-TERNT
<br /> 77
<br /> xl/7 777 NATIVE MATERIAL REPLACE
<br /> _7 77,77
<br /> IN LIKE KIND, COMPACT
<br /> TO 90% RELATIVE ew
<br /> X)
<br /> E-ME LR_A
<br /> DENSITY. TRAFFIC AREAS cc
<br /> c
<br /> CONTROL CONDUITS BACKFILL WITH 5/8- c _y
<br /> V)
<br /> PER PLAN C3 MINUS CRUSHED TOP
<br /> 0asc
<br /> COARSE AND COMPACT 0 a C.5
<br /> 4" MIN, CDF CAP PER�_�'///,\\'
<br /> STATE DOT STANDARDS
<br /> ". . ............... TO 95% MAX, RELATIVE
<br /> DENSITY,
<br /> 4" CLR,
<br /> 0 C.
<br /> _D Z
<br /> 0 Z
<br /> 'TO BE INSTALLED IN (TYP,) t o 6 0 ,01cn
<br /> LOCATIONS WHERE
<br /> CONDUITS RUN THROUGH 4" MIN, Cll,�
<br /> x -D
<br /> C,
<br /> 4 z
<br /> LANDSCAPE AREAS, < z U.J
<br /> (TYP�) z u� M C)
<br /> 3" ASPHALT CONCRETE PAVEMENT "SCHOOL LjJ rN
<br /> 24" MAX z
<br /> CD (5
<br /> YARD MIX" CN cxD 0
<br /> 12" MIN z
<br /> 00 (N r- ER >
<br /> (3) (D 00 z
<br /> LU
<br /> ------------
<br /> ------------ ......... < z
<br /> ru-) Lo CD t5
<br /> B" BASE COURSE COMPACTED 95%
<br /> (2
<br /> z
<br /> C'14 r,4 z
<br /> Lo
<br /> MINERAL., AGGREGATE TYPE 1) CONDUIT TRENCH DETAIL
<br /> Lo U-)
<br /> (6" MINERAL AGGREGATE TYPE 2) >
<br /> NOT TO SCALE V) W
<br /> !\-COMPACTED SUBGRADE
<br /> 1, PROVIDE PULL BOXES (SIZE PER CODE) FOR CONDUITS AS REQUIRED FOR
<br /> S
<br /> EVERY 250' OR AFTER A TOTAL Of" 270 DEGREES OF BENDS,
<br /> 2, PROVIDE SUFFICIENT ADDITIONAL LENGTH OF CONDUCTORS
<br /> AT THE TERMINATION POINTS OF" ALL CONDUITS FOR FINAL
<br /> z
<br /> SECTION
<br /> EQUIPMENT HOOKUP,
<br /> 0
<br /> ASPHALT PAVEMENT 4�1
<br /> 3, SUPPLY AND INSTALL ALL CONDUITS/CONDUCTORS AND A:�
<br /> Q_ NOT ro SCALE A 25 LB, PULL WIRE IN EACH SPARE/FUTURE CONDUIT, W
<br /> E
<br /> 3 C-)
<br /> z
<br /> AD
<br />
|