My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/8/2018 9:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\REYNOLDS RANCH\2680\PR0535432\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> Section 17 of the evaluation forms provides for the application of testing diesel lines used in <br /> the evaluation. The requirements for Attachment 8 include a justification provided by the <br /> manufacturer with concurrence by the evaluator. <br /> The justification for allowing the use of the FE Petro STP-MLD-D leak detector on diesel lines <br /> is based on its performance under the most stringent test conditions imposed by the EPA protocol <br /> and on its past performance record on gasoline pipelines. <br /> Application to Diesel Lines and Ultrazol 9888 Lines <br /> The attached report presents the results of testing with diesel fuel on an FRP line with a total <br /> capacity of 341 gallons.Testing was conducted at the two temperature extremes as well as under <br /> neutral conditions. The test results on the diesel line meets the EPA performance criteria. <br /> An addendum to include testing with Ultrazol has been added to this document. The size <br /> pipeline used was 2 in diameter by 40 ft. long containing 27 gallons of Ultrazol. Caution <br /> should be used in testing larger lines even though the STP-MLD-D leak detector has been <br /> approved for much larger lines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.