My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:16 PM
Creation date
11/8/2018 9:53:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\COMPLIANCE INFO 2010 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2012
QuestysRecordDate
4/25/2018 3:57:18 PM
QuestysRecordID
3867065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing oj'UST spill containment structures. The completed/orm and <br /> printouts from tests (if applicable),should be provided to the facilityowner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Fast Lane-Lathrop (Truck Side) Date of Testing: 5/23/2011 <br /> Facility Address: 116 E Roth Road, Lathrop, CA 95330 <br /> Facility Contact: Hardeep Gill Phone: 707-326-0369 <br /> Date Local Agency Was Notified of Testing: 5/5/2011 <br /> Name of Local Agency Inspector(ifpresent during testing): Thuy Tra i. <br /> 2. TESTING CONTRACTOR INI JRMATION <br /> Company Name: EPIC Compliance Systems Inc. <br /> Technician Conducting Test:Al Milburn <br /> Credentials: 0 CSLB Contractor B ICC Service Tech. ❑ SWRCB Tank Tester ❑Other(Specify) <br /> License Number(s): 956953 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: 0 Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: 1 hrLake Test Equipment Resolution: 1)16" <br /> Identify Spill Bucket (Br Tank 1 2 3 4 <br /> Number, Stored Product, etc.) Diesel South Diesel North <br /> Bucket Installation Type: ❑Direct Bury ❑Direct Bury ❑Direct Bury ❑Direct Bury <br /> 0 Contained in Sump 0 Contained in Sump ❑Contained in Sump ❑Contained in Sump <br /> Bucket Diameter: 12" 12" <br /> Bucket Depth: 15" 15" <br /> Wait time between applying <br /> vacuum/water and start of test: 5 min 5 m:.i <br /> Test Start Time(T,): 1245 1245 <br /> Initial Reading(R,): 11 1/16" 14.25" <br /> Test End Time(TF): 1345 1345 <br /> Final Reading(RF): 11 1/16" 14.25" <br /> Test Duration(TF—T,): 1 hr 1 hr <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or ± 1/16" ± 1/16" <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> All Pass <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> 7 hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: ��` �G12� Date: 5/23/2011 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.