My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:16 PM
Creation date
11/8/2018 9:53:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\COMPLIANCE INFO 2010 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2012
QuestysRecordDate
4/25/2018 3:57:18 PM
QuestysRecordID
3867065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification Form: Addendum for Vacuum/Pressure Interstitial Sensors <br /> I. Results of Vacuum/pressure Monitoring Equipment Testing <br /> This page should be used to document testing and servicing of vacuum and pressure interstitial sensors.A copy of this form must be included <br /> with the Monitoring System Certification Form,which must be provided to the tank system owner/operator.The owner/operator must 1ubmit <br /> a copy of the Monitoring System Certification Form to the local agency regulating UST systems within 30 days of test date. <br /> Manufacturer: Veeder Root Model: System Type: ❑ Pressure; Q <br /> Vacuum <br /> Sensor ID <br /> S1 Component(s)Monitored by this Sensor: 87 Product Line <br /> Sensor Functionality Test Result: 0 Pass; ❑ Fail Interstitial Communication Test Result: <br /> ❑ Pass; El Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; <br /> ❑ Fai <br /> S3 Component(s)Monitored by this Sensor: $7 Vapor Line <br /> Sensor Functionality Test Result: 0 Pass; ❑ Fail Interstitial Communication Test Result:❑ Pass; ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; <br /> ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result:❑ Pass; <br /> ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result:❑ Pass; <br /> ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; <br /> ❑ Fai <br /> Components)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; <br /> ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result:❑ Pass; <br /> ❑ Fai <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: <br /> How was interstitial communication verified? Ll Pass; L1 Fai <br /> ❑ Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; ❑ Visual Inspection;p El Other(Describe in Sec. <br /> J,below <br /> Was vacuum/pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No(/f no, describe in Sec.J, <br /> below <br /> J. Comments: S1 and S3 are programmed for positive shut-down. <br /> Page 4 of 5 <br /> If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br /> sensor,vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br /> w .unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.