Laserfiche WebLink
0 0 <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone: (209)468-3420 Fax:(209) 468-3433 Web:www.s'qov.org/ehd/unitiii.htmi <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br /> Facility name: Inspection dates I <br /> Facility address: /� UST#1 , <br /> l � dl!__17 Product <br /> Fate ity contact: '''v t v` Title: Phone: <br /> 370 4 1, <br /> Monitoring panel: Piping system: Overfi prevention: Violations: <br /> Jf � ��(� Pressurized Li Suction D Gravity C Mechanical ❑Mi-RDetect o M2-RPrev 0 M3-Both <br /> L.7J udible/visual <br /> Inspec ion type: esi�nated o(AJe,�r�ator: [CC exp.date: <br /> 0 Routine Monitoring Certification 0 Installation 0 Other: �V- � n <br /> On site Service Technician's name: ICC exp.date: Manufacturer's training: 1 <br /> Aivik Ki rn 09, •lz VV2, D'h l U L off. Z <br /> # Code SectionVIOLATIONS R <br /> HSC=CA Health&SafetyCode; CCR=CA Code of Regulations;V=Violation; RV=Re eat Violation V V <br /> 1 HSC 25284 No permit to o este <br /> Secondary containment: (a)test not performed; (e)test report not submitted within 30 days; (f)test <br /> 2 CCR 2637 notification not provided to the Environmental Health Department(EHD) at least 48 hours prior to <br /> conducting the test <br /> 3 CCR 2711 b Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form <br /> 4 HSC 25292.2 Current financial res onsibili documents not on file with the EHD <br /> 5 1 CCR 2632(b) Monitoring Program (Monitoring &Response Plans is not current or approved by the EHD <br /> 6 CCR 2712(i) Monitoring plan, response plan,and/oroperating permit and all conditions not onsite <br /> Maintenance&monitoring records not maintained 3 years,cathodic protection records for 6'/1 (M1) <br /> years,written performance claims pertaining to release detection systems for 5 years,or records of <br /> repairs, linings, and upgrades for the life of the tank. Monitoring records include: (1)date and time of <br /> 7 CCR 2712(b) all monitoring or sampling; (2) monitoring equipment calibration and maintenance records; (3) results �( <br /> of any visual observations; (4) results of sample analysis performed a lab or in the field; (5)logs of all <br /> readings of gauges or other monitoring equipment,ground water elevations, or other test results; (6) <br /> results of inventory readings and reconciliations <br /> 8 CCR 2643(d) Daily monitoring of suction 2iping (pre-January1, 1984 not performed M1) <br /> 9 HSC 25292.1 UST system is not operated to prevent unauthorized release, including spills and overfills <br /> 10 CCR 2632(c)(2) Monitoring system is not present in the interstitials ace of a double walled UST M1) <br /> 11 CCR 2630(d) UST monitoring equipment is not installed or maintained to detect a leak at the earliest opportunity(mi) <br /> 12 HSC 25291(b) UST monitoring system incapable of detecting leak from primary containment into secondary (M1) <br /> containment <br /> 13 CCR 2636(f)(1) Failed to maintain a continuous monitoring system for underground piping& UDCs that activates (M1) <br /> an audible and visual alarm or stops flow of 2roduct at the dispenser when it detects a leak <br /> 14 CCR 2631(a) Primary containment is not product tight <br /> 15 HSC 25291 a 2 Secondary containment for UST system is not tight <br /> 16 CCR 2636(c)(1) All releases in secondary pipingdo not flow to a collection sum <br /> 17 CCR 2636 2 Line leak detectors not installed or failed to detect a 3-gallon per hour leak at 10 psi M1 <br /> 18 CCR 2635(b)(1) Spill container failed to contain a minimum capacity of five gallons, or failed to provide a means (M2) <br /> to keep the spill container empty <br /> 19 CCR 2635(b)(2) Overfill prevention system was overridden or failed to meet overfill requirements in this section Mz) <br /> 20 CCR 2636(a) Failed to have secondary containment far piping (includes conventional suction piping) (Mz) <br /> 21 HSC 25291 a Water in 20 containment not removed, analyzed &properly disposed of <br /> Unauthorized release that: (c)did not escape secondary containment and cleaned up within eight (M1) <br /> 22 CCR 2650 hours was not recorded; (e)escaped secondary containment, not cleaned up after eight hours,or a <br /> sudden loss of product was not reported to the EHD within 24 hours <br /> 23a CCR 2715(a) Failed to inform the EHD of a change of designated operator within 30 days <br /> 23b CCR 2715(b) Designated operator dT!P&l <br /> rrent ICC UST System Operator certification <br /> EHD inspector: Title: <br /> EHD 3-02-002 REV 2all0 UST INSPEC ION REPORT <br />