Laserfiche WebLink
Return to Compliance for November 22, 2010 Inspection <br /> Fast Lane Central Valley <br /> 1. A payment plan was worked out with Accounting Department of the San Joaquin County <br /> Environmental Health Department.The first payment was made to the EHD in November. <br /> 2. Financial responsibility forms sent to site and submitted to EHD previously. <br /> 3. UST Monitoring plan and response plan submitted previously. Forms also sent to site. <br /> 4. The UST operating permit will be sent on completion of the payment plan to the EHD. However, <br /> we are able to continue operating legally as we have a payment plan to clear up the past due <br /> balance. <br /> 5. Monitoring certification, line leak detector,and spill bucket tests sent to site and delivered to <br /> EHD by site manager. <br /> 6. The 91 product sensor will be replaced within the coming days.The service contractor was <br /> waiting for the returned permit in order to schedule the work. I except to know with a day or <br /> two when this is to be scheduled. <br /> 7. In order to help the Designated Operator report more completely each month the site will <br /> maintain a written log at the monitoring panel. On site manager will follow up to ensure DO has <br /> properly address the noted alarms during their monthly inspection. <br /> 8. An investigation into the fuel sump found no reasons why liquid had entered the STP or the vent <br /> box.While the service contractor is repairing the 91 product sensor a thorough investigation to <br /> the cause will be conducted. <br />