Laserfiche WebLink
MONITS3ING SYSTEM CERTI%CATION <br /> CERTIFICATION / TEST DATE: February 17, 2010 <br /> Al. FACILITY A2. OWNER <br /> Name Fast Lane Lathrop Name Christina Gill <br /> Address 116 E. Roth Road, Lathrop,CA 95330 Address 111 Healdsburg Avenue,Healdsburg,CA 95448 <br /> Phone# 707-431-0541 Phone# 707-431-0541 <br /> Contact Christina Gill Contact Christina Gill <br /> F. IN-TANK GAUGING / SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all Input wiring been Inspected for proper entry and termination,Including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No" Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ WA (check aff that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually Inspected? <br /> ❑ NIA _ <br /> ❑ Yes ❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> ©2006 Walton Engineering,Inc. <br /> Page 3 of 3 <br />