Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) 0 <br /> 1. Site map enclosed? YES [$ NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all/cribehow <br /> r training c ificates for each <br /> person installing or testing any component that is repaired or replaced. Ensof the "S' Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaireand attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a comribe how this will be done. (If <br /> addin piping, UDC's, or other UST equipment, or performing tank top upge UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace the 91 STP sump sensor and vac float sensor liquid <br /> bowl tubing connection. Part #330020-464 , # 0020-463 , #330020-467 . <br /> NOTE: After replacing the liquid bowl t e sensor will need to be <br /> tested for proper operation. If the ensor is working properly <br /> it will not need to be replaced. <br /> 4. List of equipment to be used ( ach manufacturer's specification sheets showing third-party approval): <br /> Veeder Rc - Vac Float kit part 4330020-467, 330020-464 <br /> #33020- 63 . <br /> 2 <br />