My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piping information continued- <br /> Check <br /> B e <br /> eet, <br /> HSC <br /> 25290.1(c)(1) Piping compatible with material intended to be stored. <br /> 290.2 c 1 <br /> OCR Design and construction of piping approved by independent testing organization(e.g.UL). <br /> 2631 <br /> Piping,including vent lines,sloped toward tanks with minimum 1/4 inch sloe per I foot of tun. <br /> HSC <br /> 25290.1(k) <br /> 25290.2®&O) Vapor recovery,fill riser,and vent line piping are secondarily contained. <br /> G. OVERSPILL/OVERFILL PREVENTION: <br /> Check <br /> Bax codo. <br /> non <br /> 23 CCR Overspill containment having minimum capacity of 5 gallons provided at each tank fill location. <br /> 2635(b) Manufacturer 41& Model <br /> Approved overfill prevention device provided at each tank fill location. <br /> Choose One of the following methods: <br /> ❑ Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or <br /> triggering an audible visual alarm <br /> ❑ Restrict delivery of flow to the tank at least 30 minutes before the tank overfills,provided the <br /> restriction occurs when the tank is filled to no more than 95 percent capacity;and activate an audible <br /> 23 CCR alarm at least five minutes before the tank overfills <br /> 2635(b)(2) � <br /> CYProvide positive shut-off flow to the tank when the tank is filled to no more than 95 percent of <br /> capacity. <br /> ❑ Provide positive shut-off of flow to the tank so that none of the fittings located on the top of the <br /> tank are exposed to product due to overfilling. <br /> Manufacturer 19VOA Model ik3e — /JVD G —� <br /> H. CORROSION PROTECTION: <br /> Check <br /> Code <br /> Section <br /> Fiberglass reinforced plastic(FRP) <br /> Piping corrosion protection: ❑ Steel with cathodic protection or impressed current <br /> 23 CCR ❑ Steel ' lated from contact with backfill <br /> 2636(b) <br /> RP or equivalent non-metallic exterior coatings or coverings <br /> Tank corrosion protection: ❑ Sacrificial Anode <br /> 23 CCR ❑ Steel tank with field installed cathodic protection or impressed <br /> 5(a)(2) <br /> current <br /> Tie-downs,when used,constructed of non-corrosive material or coated steel. <br /> -7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.