My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gilbarco : In-Station Diagnostics-Read�Dispensers • Page 1 of 2 <br /> Qk GILBARCO111111101 <br /> 4111111111101VEMER-ROOT search + + navigator lExtranet Login�Me �, ff solutions�,&�z products a services a support 0 company in plets + <br /> Veeder-Root :: Gasboy :. Events :: Cont; <br /> Gilbarco Inc. <br /> t t In-Station Diagnostics-Ready Dispensers <br /> a Fueling Systems <br /> Alternative Fuels <br /> Pumps&Dispensers <br /> >ISD Ready Dispensers V 6 ISO Ready Encore`500 Dispensers <br /> >Oval Canopy make vapor recovery installation <br /> >SMART Connect easier, and saves time and money in <br /> >Inform ,�': <br /> >Encore 300 Ultra-Hi Flow the Field! <br /> >Encore 300 <br /> >Encore 500 <br /> >Advantage-MPD 3 !"'a-snz,• ,.. _ <br /> >Dimension Plus <br /> >Performer <br /> >Legacy-Mechanical <br /> >Legacy-Commercial <br /> >Endeavor <br /> >Advantage-Blenders <br /> >Advantage-Quads & Duals <br /> >Enterprise-MPD/P <br /> >Lega cy-Electronic <br /> >S-MPD <br /> !>Enterprise-4 Hose Dual & ' <br /> `-- Single <br /> >Gilbarco Dimension <br /> >396 Getting You Ahead Of The Game In Compliance <br /> >109 Consumer Pump <br /> Environmental Products Gilbarco Veeder-Root's In-Station Diagnostics (ISD) ready Encore® 500 dispensers prepare <br /> Remanufactured Products you for easier installation of systems designed to meet new vapor recovery compliance <br /> standards, saving you up to three times the cost and time of field modifications. <br /> ■ Retail Products Don't Be Caught Off-Guard With New Compliance Regulations <br /> ■Contact a Representative The dispensers are equipped with modified piping that cuts the time and expense of <br /> ■ Request Information upgrading dispensers to include Veeder-Root's ISD system. Petroleum retailers in California <br /> will be required to add an ISD system to new sites built after October 2004 and existing <br /> sites by October 2008 in order to meet Enhanced Vapor Recovery (EVR) regulations. Other <br /> states will likely follow suit so now's the time to act. <br /> Keeping Track Of Your Entire Site <br /> With the Veeder-Root ISD system, you can monitor the operation of your vapor recovery <br /> system and avoid losses due to faulty equipment, gasoline vapors lost to the environment <br /> and potential fines for non-compliance. The system helps keep you in compliance with <br /> sensors that: <br /> • Monitor tank inventory levels and vapor pressure <br /> • Conduct a 2-inch decay test on a tank's ullage space of the tanks <br /> • Record the amount of fuel dispensed from each dispenser along with the volume of <br /> air returning from the car during fueling <br /> • Provide dally A/L ratio for each fueling position <br /> • Monitor the operation of a Vapor Processor if installed <br /> • Detect faulty Stage I and Stage II vapor recovery equipment <br /> • Create monthly reports on the operation of the vapor recovery system <br /> • Provide a warning if the vapor recovery system is operating outside required levels <br /> • Alarm and shutdown the affected fueling points if the equipment fails and is not <br /> http://www.gilbarco.com/ind_product.cfn?ContentItemID=196 10/14/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.