Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM 4.0 <br /> <br />Final Environmental Impact Report – Lathrop Pilot Flying J 4.0-7 <br /> <br />ENVIRONMENTAL IMPACT MITIGATION MEASURE MONITORING <br />RESPONSIBILITY TIMING VERIFICATION <br />(DATE/INITIALS) <br />seeding. Sediment control BMPs, installing silt fences or placing straw <br />wattles below slopes, installing berms and other temporary run-on and <br />runoff diversions. These BMPs are only examples of what should be <br />considered and should not preclude new or innovative approaches currently <br />available or being developed. Final selection of BMPs will be subject to <br />approval by City of Lathrop and the RWQCB. The SWPPP will be kept on site <br />during construction activity and will be made available upon request to <br />representatives of the RWQCB. <br /> <br /> <br /> <br />Impact 3.5-3: The proposed project has the potential to be located on a geologic unit or soil that is unstable, or that would become unstable as a result of project implementation, and potentially result in landslide, lateral spreading, subsidence, liquefaction or collapse <br />Mitigation Measure 3.5-2: Prior to earthmoving activities, a certified <br />geotechnical engineer, or equivalent, shall be retained to perform a final <br />geotechnical evaluation of the soils at a design-level as required by the <br />California Building Code Title 24, Part 2, Chapter 18, Section 1803.1.1.2 <br />related to expansive soils, liquefaction and other soil conditions. The <br />evaluation shall be prepared in accordance with the standards and <br />requirements outlined in California Building Code, Title 24, Part 2, Chapter <br />16, Chapter 17, and Chapter 18, which addresses structural design, tests and <br />inspections, and soils and foundation standards. The final geotechnical <br />evaluation shall include design recommendations to ensure that soil <br />conditions do not pose a threat to the health and safety of people or <br />structures. The grading and improvement plans, as well as the storm <br />drainage outfall and building plans shall be designed in accordance with the <br />recommendations provided in the final geotechnical evaluation. <br />City of Lathrop Community Development Department <br />Prior to earthmoving activities <br />Impact 3.5-4: Potential for expansive soils to create substantial risks to life or property <br />Implement Mitigation Measure 3.5-2 City of Lathrop Community Development Department <br />Prior to earthmoving activities <br />GREENHOUSE GASES AND CLIMATE CHANGE Impact 3.6-1: Potential to generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment or potential to conflict with an applicable plan, <br />Mitigation Measure 3.6-1: Ensure that the pedestrian network within the <br />proposed annexation area connects to offsite pedestrian networks. Project <br />frontage improvements shall be included to ensure the project is consistent <br />with citywide street design standards and planed nearby circulation <br />improvements. <br />City of Lathrop Community Development Department <br />During construction activities