My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
xrct�47 rc„A <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> oP4�'N SAN JOAQUIN COUNTY <br /> Unit Program Coordinators <br /> Donna K.Henan,RE.H.S. 600 East Main Street Carl Borgman,R.E.H.S. <br /> u� :< Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Stockton, California 95202 Margaret Lagorio,R.E.H.S. <br /> • d... 4 :'r• Laurie A.Cotulla,R.E.H.S. Telephone: (209)468-3420 Robert McClellan,R.E.H.S. <br /> ��lvB-n Assistant Director Fax: (209) 468-3433 Jeff Car Foley,R.E.H.S.Kaley Foley,R.E.H.S. <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Environmental Health Department (EHD) has established the following <br /> guidelines to assist you in the completion of your construction project. The guidelines <br /> specify the construction and monitoring criteria necessary to complete our review of your <br /> proposed underground storage tank(UST) system. <br /> A. PLAN REVIEW GUIDELINES FOR NEW INSTALLATION OF UST's <br /> 1. An installation permit and payment of appropriate fees shall be required for the <br /> installation or modification of any underground storage tank system, which will be used <br /> for hazardous substances. <br /> 2. Contractors shall submit, or have on file with the local agency, information verifying <br /> that they possess a current State Contractor's License (A, B, C-36, or C-61/D-40), <br /> hazardous substance removal certification, and Workmen's Compensation Insurance. <br /> 3. The contractor shall be responsible for ensuring that conditions at the site provide for <br /> workplace safety, protection of the environment, and maintenance and integrity of <br /> nearby structures. <br /> 4. Under no circumstances shall any regulated material be placed into any underground <br /> tank system without approval of the EHD. <br /> 5. All tanks, piping, and equipment shall be installed and tested in accordance with the <br /> manufacturer's recommendations/guidelines. <br /> 6. All interstitial monitors must perform according to manufacturer's standards, and must <br /> be tested annually in accordance with section 2630 (d), California Code of Regulations <br /> (CCR),Title 23 Waters, Division 3, Chapter 16. <br /> 7. Permits and/or plan check approval may also be required by the San Joaquin Valley <br /> Unified Air Pollution Control District, the County/City Building Department and the <br /> appropriate Fire District. <br /> 8. Applicant/contractor shall adhere to the approval plan and any change or deviation shall <br /> be reported to and approved by EHD prior to installation. <br /> 9. The application for installation of underground tanks is only valid for the calendar year <br /> in which it has been issued. A permit may be extended into the next calendar year if a <br /> letter is sent to EHD requesting this extension thirty days prior to the end of the <br /> calendar year. A one time, one year extension may be granted by EHD upon receipt of <br /> this letter. <br /> Revised 8/3/07 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.