Laserfiche WebLink
j/18/2005 09:01 2094683433 EHD PAGE 05 <br /> SAMPLING PROTOCOL FOR ROUTINE PIPING/DISPENSER REMOVAUREPLACEMENT <br /> Tt e. following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> re resentative of native soils beneath the tank's Invert (tank's bottom) at a colleclion depth not to exceed 2 • 4 feet. If <br /> co taminabon Is documented during Closure, an unauthorized Release Notification must be completed and submitted within <br /> fiv 1 (5)working days pursuant to California Health 8 Safety Coda, Section 25285, <br /> DISPENSER SAMPLES. <br /> AT LEAST ONE SAMPLE BELOW EACH DISPENSER <br /> I <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 201ineal feet <br /> DISPENSER 8 PIPING STOCKPILE SAMPLES 2 Samples every 5D cubic yards <br /> 5 <br />