My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1"1GVL.I v `v <br /> JUL 07 2014 <br /> SWRC ,January 2002 <br /> 6. PIPING SUMP TESTING ENVIRONMENfAI=REAL H <br /> ENT <br /> Test Mhod Developed By: Llona Sump Manufacturer ❑Industry Standard X Pro ssingmeer <br /> ❑Other(Spec) <br /> Test M od Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Eq 'pment Used: Caldwell Level Change Indicator quipment Resolution: .002 <br /> Sump# 1Sump# Sump C Sump# <br /> Sum"iamneter: 42" <br /> SumpDepth: 48" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 16" <br /> Hi hes ll Piping Penetration: <br /> Height fionn Tank Top to Lowest 20" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Line 18" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail-safe Yes <br /> shutdown?* <br /> Was fail-safe verified to be No <br /> operational?* <br /> Wait time between applying water 5 Minutes <br /> and sta[ing test: <br /> Test St rt Time: 12:55 <br /> Initial ieading(Ri): .001 <br /> Test End Time: 1:25 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change,in Reading(R,-R�): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Test exult: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and Yes <br /> verifiedfunctional after testin ? <br /> Comin eats—(include information on repairs made prior to testing, and recommended ollow-u orfailed tests) <br /> If the ehtire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk *)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.