My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • HECEiVE® <br /> D. Rel ults of Testing/Servicing <br /> Software ersMAY272015ion Installed: 8.04 (� <br /> Complete he folwin checklist: EIVVj AL <br /> 0 Yes ❑ No' I Is the audible alarm operational? U nCD8OT4sC IT <br /> 0 Yes ❑ No' Is the visual alar operational? <br /> 0 Yes ❑ o' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes Elo' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> 0 N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down rf the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) 0 Sumpfrrench <br /> Sensors; O Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0 Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> 0 N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alar tdgger7 % <br /> ❑ Yes 0 No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' 0 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> 0 Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,0 applicable <br /> 0 Yes ❑ No' Is all monitoring equipment operational per manufacturers specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring Sy tem Certification Page 2 of 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.