My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d 8/2005 09:01 2094683433 EHD PAGE 04 <br /> 0 <br /> Hauler Registration # <br /> Address <br /> City Zip <br /> Permitted Disposal Site <br /> a. Describe the method that will be utilized to purge and/or inert the piping: <br /> b, Piping Hauler: <br /> Names5-r�_�.2.rr�F c <br /> Address_ �!4r 4 �T City`;44Lrau Zip —Z-0s" <br /> Phone <br /> Hauler Registration #(If hauled as hazardous) <br /> C. Piping Disposal Site: <br /> Nam����4{c Phone <br /> Address t n!1 �T Cityc,�L` ZK) _Zip � <br /> EPA ID# (if transported to a permitted TSD facility) t� <br /> 8. Is the sampling firm an independent third party from the contractor? YES 141 NO [) <br /> 9. Describe, in detail, how the soil and/or w sample(s) beneath the piping or dispenser will <br /> be obtaine <br /> 10. Handling of excavated soil: <br /> a) Contaminated Soil Haze dous Waste Hauler. <br /> Name Hauler Registration # <br /> Address Ciry <br /> Zip _ <br /> Phone ( <br /> b) If soil is not to be hauled, describe what will be done with it: <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.