Laserfiche WebLink
0 0 <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipm6niaJO talle <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />® <br />Yes <br />❑ <br />No` <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? ` <br />® <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />® <br />Yes <br />❑ <br />NO' <br />Were all probes reinstalled properly? <br />® <br />Yes <br />❑ <br />No` <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />Line Leak Detectors (LLD): ❑ Check this box If LLDs are not installed. <br />�,, ..-,.u.. , ,.e, a,., we „uw auu when were aenaenwes were or mu no correcreo. <br />H. Comments: <br />87 120 18 22 3 <br />91 150 20 24 4 <br />DIE 145 17 20 3 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />r Orn mere <br />ma ro,towng <br />cnecxnsr <br />® <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; [10.1 g.p.h ; ❑ 0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />NC' <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shutoff If any portion of the monitoring system is disabled or disconnected? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, have all accessible win ng connections been visually inspected? <br />® <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />�,, ..-,.u.. , ,.e, a,., we „uw auu when were aenaenwes were or mu no correcreo. <br />H. Comments: <br />87 120 18 22 3 <br />91 150 20 24 4 <br />DIE 145 17 20 3 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />