My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - PRESENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
COMPLIANCE INFO_2016 - PRESENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/8/2018 9:54:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - PRESENT
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\HWY 26\18754\PR0507164\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
1/17/2017 11:13:57 PM
QuestysRecordID
3313957
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipm6niaJO talle <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />® <br />Yes <br />❑ <br />No` <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? ` <br />® <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />® <br />Yes <br />❑ <br />NO' <br />Were all probes reinstalled properly? <br />® <br />Yes <br />❑ <br />No` <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />Line Leak Detectors (LLD): ❑ Check this box If LLDs are not installed. <br />�,, ..-,.u.. , ,.e, a,., we „uw auu when were aenaenwes were or mu no correcreo. <br />H. Comments: <br />87 120 18 22 3 <br />91 150 20 24 4 <br />DIE 145 17 20 3 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />r Orn mere <br />ma ro,towng <br />cnecxnsr <br />® <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; [10.1 g.p.h ; ❑ 0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />NC' <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />❑ <br />No' <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shutoff If any portion of the monitoring system is disabled or disconnected? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, have all accessible win ng connections been visually inspected? <br />® <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />�,, ..-,.u.. , ,.e, a,., we „uw auu when were aenaenwes were or mu no correcreo. <br />H. Comments: <br />87 120 18 22 3 <br />91 150 20 24 4 <br />DIE 145 17 20 3 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.