Laserfiche WebLink
6. <br /> �./ <br /> V • Copious amounts of potable water - Shall be readily available for both drinking purposes and for <br /> personal hygiene purposes (e.g., washing, ri sing, and cooling of face and body, etc.). A minimum <br /> of 2 gallons of drinking water per onsite worker shall be available before work begins, or a <br /> L drinking water source must be immediately available at the project site;ref. Section 3.7. <br /> • Wind-direction indicator(s)- Shall be available to provide a means of verifying up-and down-wind <br /> 6. locations for the proper placement of Decont imination and Support Zones. <br /> • Emergency references (e.g., nearest phone emergency phone numbers and services, etc., as <br /> summarized on the summary Sheet) - Shall mpany the first aid kit and shall be available at the <br /> support zone. <br /> • A vehicle easily accessible for emergency transport. <br /> 6. • Emergency Response Spill Kit consisting of absorbents, plastic liners, rags, shovels, push brooms, <br /> TyvekTM suits,gloves, half-face respirators aid cartridges <br /> 6. <br /> 6. <br /> r_ <br /> L <br /> 6. <br /> L <br /> L <br /> L. <br /> L. <br /> L <br /> Linden UST SI and Removal,Task Order No.34 Caltrans Contract 06AI895,EFIS 10-1300-0181-0 <br /> Geocon Project No.59800-01-34 -23 - October 2013,Revised September 2014 <br /> 1.. <br />