My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2014 REMOVAL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
19107
>
2300 - Underground Storage Tank Program
>
PR0539625
>
REMOVAL_2014 REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:39 AM
Creation date
11/8/2018 9:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2014 REMOVAL
RECORD_ID
PR0539625
PE
2361
FACILITY_ID
FA0022676
FACILITY_NAME
CALTRANS
STREET_NUMBER
19107
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
19107 E HWY 26
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\HWY 26\19107\PR0539625\2014 REMOVAL.PDF
QuestysFileName
2014 REMOVAL
QuestysRecordDate
7/14/2017 3:08:20 PM
QuestysRecordID
3506712
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> JAN 0 2 2014 <br /> Pre-field Activities ENVIRONMENTAL <br /> HEALEPARTMENT <br /> • A pre-work site meeting was conducted on August 12, 2013, during which Terry Fox with <br /> Caltrans and Josh Ewert with Geocon reviewed the project site and scope. The proposed UST <br /> excavation area was marked out with white paint for subsequent utility clearance by responding <br /> Underground Service Alert(USA)members. <br /> • Contacted USA (Ticket No. 449615) a minimum of 48 hours prior to performing the field <br /> activities. <br /> • Obtained a soil boring permit from the SJCEHD. A copy of the permit is attached. <br /> • Prepared a Health and Safety Plan dated October 2013 to provide guidelines on the use of personal <br /> protective equipment and the health and safety procedures implemented during the field activities. <br /> • Prepared a Workplan dated October 8, 2013, to describe the requested scope of services and to <br /> outline procedures and methods to complete the field sampling and analytical testing activities. <br /> • Retained the services of Advanced Geological Services (AGS) to perform a geophysical and <br /> utility survey. <br /> • Retained the services of Advanced Technology Laboratories (ATL), a Caltrans-approved and <br /> California-certified analytical laboratory located in Signal Hill, California, to perform the <br /> chemical analysis of soil samples. <br /> • Caltrans provided notification to the adjacent private property owner in advance of the field <br /> activities. <br /> Field Activities <br /> Geophysical Survey <br /> On September 6, 2013, AGS performed a geophysical and utility survey at the Site. AGS identified <br /> shallow metal at the UST location at Excavation 1 in addition to a buried metal anomaly and various <br /> utilities. The findings of the AGS survey are depicted on Figure 2. A copy of AGS's geophysical <br /> survey report is attached. <br /> Soil Sampling <br /> We performed two soil borings at the Site on November 18, 2013 using Geocon's direct-push rig. <br /> Borings B1 and B2 were performed on either side of the tank to a maximum depth of 16 feet. Each <br /> boring was initially advanced using a hand-auger to a depth of 5 feet to confirm clearance of buried <br /> utilities and the tank. The approximate boring locations are depicted on Figure 2 and shown on <br /> Photo No. 5. <br /> Continuous core soil samples were collected in 4-foot-long cellulose thermoplastic (acetate) liners <br /> driven by the direct-push rig at depths between 5 and 16 feet. The acetate liners were cut to obtain soil <br /> samples at 5-, 10- and 15-foot depth intervals. The liners were capped with Teflon® sheets and <br /> polyethylene end caps. Each sample container was then labeled and placed in a cooler pending <br /> delivery to ATL for chemical analyses under chain-of-custody(COC)protocol. <br /> Linden UST Site Investigation,TO No.4 Caltrans Contract 06AI895,EA No. 10-OY3600 <br /> Geown Project No.59800-01-04 -2- December 11,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.