My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2014 REMOVAL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
19107
>
2300 - Underground Storage Tank Program
>
PR0539625
>
REMOVAL_2014 REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:39 AM
Creation date
11/8/2018 9:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2014 REMOVAL
RECORD_ID
PR0539625
PE
2361
FACILITY_ID
FA0022676
FACILITY_NAME
CALTRANS
STREET_NUMBER
19107
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
19107 E HWY 26
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\HWY 26\19107\PR0539625\2014 REMOVAL.PDF
QuestysFileName
2014 REMOVAL
QuestysRecordDate
7/14/2017 3:08:20 PM
QuestysRecordID
3506712
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> �o•.Pqu,.i N••,.co <br /> Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> 1868 E. Hazelton Avenue <br /> N( :C <br /> Stockton, California 95205-6232 PROGRAM <br /> COORDINATORS <br /> Robert McClellon,REHS <br /> c^<7Foa �P Website: www.sjgov.org/ehd Jeff Carruesco,REHS,RDI <br /> Phone: 209 468-3420 Kinsey Foley,REHS <br /> ( ) Linda Turkatte,REHS <br /> Fax: (209)464-3433 Rodney Estrada,REHS <br /> Adrienne Ellsaesser,REHS <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> CLOSURE PERMIT <br /> I. GENERAL INSTRUCTIONS: <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br /> applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br /> adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings, <br /> underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from <br /> tank to dispensers. If underground utilities are not included on the site map, you must state in writing that USA <br /> Dig will be contacted prior to excavation activities. <br /> [j 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit". Not : Sampling firm <br /> shall be an independent third party from the contractor. <br /> [] 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a"Service Request"form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br /> (formerly State A&B forms)and complete the"Underground Storage Tank Program Fee Worksheet". <br /> [j 6. Complete all questions on page 9, the Environmental Health Department(EHD) "Underground Storage Tank <br /> Disposition Tracking Record", except those requiring a signature and date of tank removal. The holder of the <br /> permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the <br /> tank removal. <br /> [] 7. Submit a "Site Health & Safety Plan"as an addendum to this application, to address all potential hazards for <br /> this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the <br /> County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the <br /> Uniform Building Code STD 70-11. <br /> [] 9. Obtain a "Grading and Excavation Permit"from the City of Tracy Building Division prior to the Environmental <br /> Health Department(EHD) approval of the closure plan. <br /> [] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a$130.00/hour fee and the review will <br /> begin on the date of resubmittal. <br /> [] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> [] 12. Advance inspection notice of at least 48 hours is required by EHD. <br /> [] 13. If planning to over-excavate at time of UST removal, see"III. SITE MITIGATION" on Page 2. <br /> EH23046 (Revised 07/17/14) 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.