To protect the Comcast fiber optic conduit, the tank excavation will be backfilled with two-sack concrete <br /> sand slurry. The remainder of the excavation will be backfilled with aggregate base material and <br /> completed with asphalt concrete. <br /> Soil Sampling and Analysis <br /> Soil samples will be obtained approximately 2 feet beneath the bottom of the UST excavation using the <br /> backhoe bucket and from beneath the former dispenser pad using a hand-auger. A composite soil sample <br /> will be obtained from the drummed tank contents material and adsorbent. The soil samples will be <br /> collected in new stainless steel tubes, sealed at both ends with Teflon, capped, labeled, and placed in a <br /> chilled cooler pending transport under chain-of-custody protocols to the laboratory. <br /> The soil samples will be delivered to ATL for analysis of GRO and DRO following EPA Test Method <br /> 8O15B modified, total lead by EPA Test Method 601013, and VOCs and FOCs by EPA Test Method <br /> 8260. <br /> Report Preparation <br /> We will prepare a UST Removal Report to document the UST closure. Caltrans will be provided with <br /> one copy of the draft report,and upon receipt and incorporation of Caltrans comments,we will provide <br /> two hard copies and two electronic copies(CD)of the finalized UST Closure Report. <br /> Please contact us if you have any questions concerning the contents of this UST Removal Workplan or <br /> if we may be of further service. <br /> Sincerely, <br /> GEOCON CONSULTANTS,INC. <br /> John E. Juhrend,PE, CEG Robert Kimball, RME <br /> Principal/Senior Engineer Construction Services Manager <br /> Attachments: Figure 1,Vicinity Map <br /> Figure 2, Site Plan <br /> Site Photographs(1 and 2) <br /> Linden UST Removal Workplan,TO No.3 4 Caltrans Contract 06A1895,EA No. 10-OY3600 <br /> Geocon Project No.59800-01-34 -3 - Revised October 14,2014 <br />