The following is an itemized list of underground storage tank violations that have not <br />been addressed for LOVES TRAVEL STOP #538 as of June 25, 2018. <br />Open violations from April 12, 2018 inspection <br />Violation #111 - Failed to test monitoring and leak detection equipment annually. <br />Annual monitoring system certification and leak detector testing were last performed on April 2017 and was due by <br />April 2018. Vacuum communication testing was required to be tested at the vent sump and each dispenser during <br />the monitoring system certification. Testing has not been completed and is past due. These tests are required once <br />every 12 months. Immediately schedule these tests and provide 48 hours notification to the EHD. Please be aware <br />that a follow up inspection will be charged at our current hourly rate. <br />Page 1 of 1