Laserfiche WebLink
May 15,2003 <br /> -3- <br /> LG-161-2 <br /> The SWRCB UST Program is responsible for notifying <br /> • SWRCB UST Program Responsibility: public drinking water well that they are <br /> stems within 1,000 feet of a P 25292 4, subds. (a) and (b) <br /> owners/operators of UST systems Health & Saf. Code, §§ ram is <br /> s tit. alt § 2640, subd. (e)] The SWRCB UST Program subject to the requirements of ELD. [ <br /> 25292.5, subd. (b); Cal. Code Reg § 2640,subd. (e)(2)] <br /> considering requests for reconsideration Re from those <br /> owners/opera ors <br /> also responsible for Cal.Cod g <br /> who believe their facility is not subject to ELD. [ <br /> (See below for additional information on requests for reconsideration.) <br /> Owner/Operator Responh': <br /> sibili Owners/operators of UST systems that meet the criteria for <br /> the local agency <br /> Tete the following steps: roved by <br /> ELD must comp of ELD reviewed and app . Cal.Code <br /> • ELD Plan Approval. Have a program the SWRCB UST Program [ <br /> within six(6) months following notification by <br /> Regs.,tit.23, §2644.1,subd.(a)(3)] <br /> implement a program of ELD at their facility. perform <br /> .ELD Test Im lementation. Imp component,ELD testing must be p <br /> ♦ For UST systems with asingle-walled comp <br /> 8 months following receipt of notification from the-SWRCB UST Program. <br /> within 1 2644.1, subd. (a)(3)1 <br /> [Cal.Code Regs.tit.23, § onent,the one-time ELD test must be <br /> ♦ For UST systems without a single-walled comp 25292 5, subd. (a)] <br /> performed by January 1,2005. [Health& Saf. Code, § ducting the <br /> rs <br /> . ELD Test Notification. Notify <br /> the local agency at least 48 he loal prior to con [Id-, § 2644.1, <br /> ELD test unless this notification requirement is waived by CB UST <br /> subd. (a)(4)] test to th <br /> LD Test Result Submittal. Submit the resulss fte the tevst has been performed. [Id., § <br /> E within 60 day <br /> Program and the local agency <br /> 2644.1, subd. (a)(5)1 ram is: <br /> The address for submission of the ELD test results to the SWRCB UST Program <br /> State Water Resources Control Board <br /> Division of Water Quality <br /> Attention: Elizabeth L.Haven,UST Program Manager <br /> ELD Test Results <br /> p.O.Box 2231 <br /> Sacramento,CA 95812 <br /> is responsible for working with the tank <br /> Local Agency Responsibility: The local agency p the owner/operator within six(6) <br /> owner/operator to approve the program of ELD submitted by ogram. The local enc also must <br /> months following notification by the SWRCB US lementa on of the recommendations in the <br /> follow-up on the ELD test results and oversee imp <br /> ELD test report. <br /> What should be included in the ro ram of ELD? <br /> The request must include, in writing: <br /> lan; <br /> • A modification/amendment to the existing monitoring thplarr,d-papproved process for <br /> • Submittal of standardrequirement(oftenentation describing his is a generic document developed by the <br /> implementation of the ELD <br /> testing company);and <br /> California Environmental Protection Agency <br /> * Recycled Paper <br />