Laserfiche WebLink
F In-Tank Gauging/SIR Equipment: /Checkthis box if tank gauging is used only for inventory contra <br /> 13 heck this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the following checklist: <br /> ® Yes ❑ No's Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No's Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 1 13 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): Cl Check this box if LLD'are not installed. <br /> Co bete the followin checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak- simulated to verify rm <br /> LLD perfoanc <br /> ❑ N/A (Check all that apply) Simulated leak rate: M. 3 g.p.h.; 130.1 g p h; Q 0.2 g.plL <br /> es% ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No's Was the testing apparatus properly cubrbrateO <br /> Yes 13 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> 0 Yes ® o'� For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N <br /> DYes ti o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system i&abl( <br /> NIA or disconnected? <br /> Cl yes © o'^ For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfmmctio, <br /> T/ or fails a test? <br /> © Yes ❑ oT For electronic LLDs,have all accessible wiring connections beenvisuallyinspected? <br /> a NIA <br /> ��Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ¢In the Section F1,below,describe how and when these deficiencies were or will be corrected. <br /> I-1. Comments: <br /> Pate 3 of <br />