My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2003 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:10:35 PM
Creation date
11/8/2018 9:54:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2006
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2003 - 2006.PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2006
QuestysRecordDate
2/27/2018 6:46:39 PM
QuestysRecordID
3808828
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F In-Tank Gauging/SIR Equipment: /Checkthis box if tank gauging is used only for inventory contra <br /> 13 heck this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com fete the following checklist: <br /> ® Yes ❑ No's Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No's Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 1 13 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): Cl Check this box if LLD'are not installed. <br /> Co bete the followin checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak- simulated to verify rm <br /> LLD perfoanc <br /> ❑ N/A (Check all that apply) Simulated leak rate: M. 3 g.p.h.; 130.1 g p h; Q 0.2 g.plL <br /> es% ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No's Was the testing apparatus properly cubrbrateO <br /> Yes 13 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> 0 Yes ® o'� For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N <br /> DYes ti o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system i&abl( <br /> NIA or disconnected? <br /> Cl yes © o'^ For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfmmctio, <br /> T/ or fails a test? <br /> © Yes ❑ oT For electronic LLDs,have all accessible wiring connections beenvisuallyinspected? <br /> a NIA <br /> ��Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ¢In the Section F1,below,describe how and when these deficiencies were or will be corrected. <br /> I-1. Comments: <br /> Pate 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.