Laserfiche WebLink
Page of � - <br /> ;WRCB,January 2002 , - ------- <br /> OVERFILL CONTAINNIEN'1' B(1?if <br /> 9. SiILL/ - ------ ----- --- -- <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes,but were Not Tested <br /> -- <br /> Spill/Overfill Containment Boxes are PresentIndustry Standard Professional Engineer <br /> Test Method Developed By: Spill Bucket(vlanufact uer <br /> Other(Specij.O — -- ---- -- --- <br /> — --- - Vacuum V jydiostatic <br /> _ <br /> Test Method Used: Pressure - <br /> Other(Specifi') <br /> -- e Vquipment Resolution: <br /> Test Equipment Used: V1 <br /> Spill Box# spill Box # <br /> Spill Box# Spill Box# / --- -- <br /> ft <br /> ` <br /> Bucket Diameter: ----- t� <br /> Bucket Depth: <br /> Wait time between applying drt r b l _ <br /> l <br /> pressure/vacuum/water and -- <br /> startin test: 7 7 : r 7 <br /> Test Start Time: t j -----—-- <br /> Initial Reading(RI): <br /> Test End Time: <br /> ,• _ ! <br /> Final Reading(RF): <br /> Test Duration: T ---- <br /> Change in Reading(RF-Ri): 1 0 <br /> Pass/Fail Threshold or %�Gi S 5 _ tea S ❑ Pass ❑Fail <br /> Pass 13 Fail Criteria: Pass ❑Fail Pass ❑Fail - _ <br /> Test Result: <br /> pttnMents - (include i►rfor•mation on repairs made prior•to Iesting, and rcco►nnrended Jirllu�r-rlp-lirlirr'-fiuiled lents) —_— <br /> C _- <br /> --------------- <br /> ---------------- <br /> -- ----------- <br />