Laserfiche WebLink
Monitoring System <br /> r�Cert i cat <br /> .ti <br /> Site Address: oc e,C�� �� �� Date of Testing/Servicing: 6,Z <br /> F. In-Tank Gauging/SIR Equipment'• heck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIF,equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> L] Yes C3No" Has all input wirluding testing for ground faults? <br /> ing been inspected for proper entry and termination, inc <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> { O Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies Here or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Cltecl:this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate.4%f3 g.p.h.; ❑ 0.1 g.p.h.2; ❑ 0.2 g.p.h.= <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> GZ No* Were all LLDs confirmed operational and accurate within regulatory requirerrients? <br /> Yes ❑ NO* Was the testing appa-atus properly calibrated?. <br /> G�Yes O No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes Ll No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a[eal.? <br /> HOYNIA <br /> ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, docs the turbine automatically shut oft if any portion of the monitoring system ! <br /> N/A malfunctions or fails a test? <br /> ! ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes No` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> '] gra 1J U va�s'ri Q A cQ L 3—/v _77d <br /> ... �•nom <br />