Laserfiche WebLink
•Monitoring System Certification <br /> Site Address: 8606 THORNTON ROAD Date of Testing/Service: 04/11/2007 <br /> F. In-Tank Gauging / SIR Equipment X❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑X No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes 0 No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes MNo' Was accuracy of system product level readings tested? <br /> ❑Yes QNo' Was accuracy of system water level readings tested? <br /> Yes ❑No A Were all probes reinstalled properly? <br /> ❑Yes I ❑X No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Yes El No' ❑N/A (Check all that apply)Simulated leak rate: X 3 h 0.1 h 0.2 h <br /> ❑ 9.p. ❑ g.p. ❑ g.p. <br /> ❑X Yes ❑No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑X Yes ❑NoWas the testing apparatus properly calibrated? <br /> ❑X Yes ❑No* ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No* ❑X N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No* ❑X N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No' FIN/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No' Q N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> El Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />