Laserfiche WebLink
SWRCB,January 2002 • • Page 2 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F-1 Spill Bucket Manufacturer ❑X Industry Standard F-1 Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum x❑ Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 PRE FILL Spill Box# 1 PRE VAPOR Spill Box# 2 PLU FILL Spill Box# 2 PLU VAPOR <br /> Bucket Diameter: 11 <br /> Bucket Depth: 11" 11T 11" 11, <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 11:30 11:30 11:26 11:26 <br /> Initial Reading(Ri ): 611 811 611 811 <br /> Test End Time: 12 :3 0 12 :3 0 12 :2 6 12 :2 6 <br /> Final Reading(RF ): 611 811 611 81, <br /> Test Duration: 1HR 1 HR 1 HR 1 HR' <br /> Change in Reading(R F-RI ) 0 0 0 0 <br /> Pass/Fail Threshold or PASS PASS PASS PASS <br /> Criteria: <br /> Now <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />