My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • • Page 2 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F-1 Spill Bucket Manufacturer ❑X Industry Standard F-1 Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum x❑ Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 PRE FILL Spill Box# 1 PRE VAPOR Spill Box# 2 PLU FILL Spill Box# 2 PLU VAPOR <br /> Bucket Diameter: 11 <br /> Bucket Depth: 11" 11T 11" 11, <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 11:30 11:30 11:26 11:26 <br /> Initial Reading(Ri ): 611 811 611 811 <br /> Test End Time: 12 :3 0 12 :3 0 12 :2 6 12 :2 6 <br /> Final Reading(RF ): 611 811 611 81, <br /> Test Duration: 1HR 1 HR 1 HR 1 HR' <br /> Change in Reading(R F-RI ) 0 0 0 0 <br /> Pass/Fail Threshold or PASS PASS PASS PASS <br /> Criteria: <br /> Now <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.