My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ✓�4 <br /> Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2708671 Date: 12/21//06 <br /> Facility Address:8606 Thornton Rd. <br /> City:Stockton Zip Code:95209 <br /> Designated UST Operator Conducting the Inspection:Julie Lee <br /> International Code Council Certification#:5248777-UC Ex iration Date: 12/14/2006 <br /> Signature: - °� °� Phone:(510)245-5218 <br /> Y=Yes,N=No,NA=Not Applicable <br /> Item MONITORING PANEL/ALARM HISTORY Y N INA <br /> " r_ <br /> I Monitoring system is powered on and in proper operating mode. x <br /> 2 Monitoring system is not currently showing any alarms or warnings. x <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the x <br /> Designated UST Operator. Attach a copy of the alarm history report/logreport1log to thisform i available. <br /> 4 Each alarm for the previous month has been responded to appropriately. x <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. x <br /> 5a _ List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded to,and <br /> properly addressed,the cause of the alarm.Attach documentation verifying appropriate service to this report. <br /> I sum in ection is re uired,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sums is only required in su s where an alarm has occurred in thepast month or which there is no service record. <br /> Y N Y N <br /> Sump Location: Sump Location: <br /> Sump Location: Sum Location: <br /> Sump Location: Sumv Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1—Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:89 x Tank 4—Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Y N NA Y N INA <br /> Dispenser 1/2 x Dispenser 9/10 <br /> Dispenser 3/4 x Dispenser 11/12 <br /> Dispenser 5/6 Dispenser 13/14 <br /> Dispenser 7/8 777,77, Dispenser 15/16 <br /> .... .. .... ....�.W,77 ... ._ <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. x <br /> 10 Secondary containment tests have been completed within the required timeframe. x <br /> 11 Spill containment structure(bucket)testing was completed within the past year. x <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within required timeframe. x <br /> 14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> MIM `r'j �€t >''('e'r'rc 7tx; ,'0";i <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> L1a <br /> acilit em to ees have received the re uired on-the-'ob trainin within the ast ear. x <br /> acili em to ees hired within the ast 30 da s have received the re uired on-the-'ob trainin . x x <br /> Note: Any answer of'IN"should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.