Laserfiche WebLink
Y. 17. 2007 8 . 1 AM No. 0823 P. b <br /> k #0671 40 FAX NO. :9527764 10May. 14 2007 09:49AM P1 <br /> Designated Operator (DO) Employee'Training <br /> Site Number: -Ror� ( DO Name&Certificate No.: Sema N-Habte 5305249-UC <br /> Site Address: a,20(" �fi//ZTO-'� QA I <br /> • Designated UST Operator's Primary responsibilities <br /> 1. Monthly visual inspections of the UST facility <br /> 2; On-the-job training for "facility employees" every twelve mOnths, starting July 1, 2005. <br /> %ployecs fired on or after July 1,2005 must be trained within 30 days of their date of hire. <br /> • DO Employee Training Topics <br /> -1. Unde Wding UST System Components and OverWons <br /> A. Tank information for the site: size,Material,installation date, and type <br /> B. Overfill and spill protection: Turbine swaps,spill buckets,and under-dispenser containments <br /> C.Piping:Material,types and installation date <br /> D, Site Plot Plan—Locations of UST systems(HMR) <br /> 2. Understanding LeWLnetMion S' sv is s) <br /> A. UST leak detection methods (e.g., ATO, SIR, CSLD, or CM) and devices (e.g., Interstitial <br /> Monitoring),product piping leak detection, sensors in the sumps, <br /> B. Types and functions of leak detection systems(e.g.,electronic or mechanical) <br /> C, Tank Testing Results, Inventory Reconciliation and Daily&Monthly Inspection Checklists <br /> 3, Respondingto o &,gt, nm Alarms <br /> A, Difference between an alarm and a system failure(Delivery Needed&Fuel Alarms) <br /> B.Emergency Contact Information—SolvOne or Regional HSE Specialist <br /> C.Alarm Log Update <br /> 4. Spill &Leak Regyonse <br /> A.Spill/Overfill response Procedure <br /> B. Spill response equipments <br /> C.Emergency Shut-off Button <br /> D.Disposal of Waste <br /> Employee Name Si9patolo Date Em to ea Name Si ature Date <br /> MAINTA]N THIS FORM UNDZR ENVMONMENTAL gEMRD BOX TAB#4 <br />