Laserfiche WebLink
• <br />CJ <br />Installation Procedure Veeder-Root Parts <br />Cable to CCVP <br />I probe (factory <br />d) <br />To <br />Smart Sensor <br />Interface Module <br />isd-evr\ccvp5.eps <br />iau ., q--- wcvp'—ps <br />2 -pin connector <br />IP valve connector <br />and of cable connects <br />field wiring in upperj-box) <br />Carbon Canister <br />Figure 4. Locating the CCVP vapor valve connector <br />Seal -off <br />(only req'd <br />at lower <br />j -box) <br />1/2" rigid <br />conduit <br />Epoxy sealed connections in a <br />weatherproof junction box <br />— Black <br />I 2 -conductor cable <br />+ --\ White to CC vapor valve <br />Figure 5. Field wiring CCVP vapor valve <br />18-8 <br />ARB approved IOM 18 - Carbon Canister Vapor Polisher Installation and Maintenance Guide - Executive Order VR -203 and VR -204 <br />